Statements (27)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_station
|
| gptkbp:country |
gptkb:Bangladesh
|
| gptkbp:electrification |
1,500 V DC overhead catenary
|
| gptkbp:end_station_(Line_6) |
gptkb:Motijheel
|
| gptkbp:first_phase_opened |
December 2022
|
| gptkbp:fundedBy |
gptkb:Japan_International_Cooperation_Agency_(JICA)
|
| gptkbp:length |
20.1
|
| gptkbp:line |
gptkb:MRT_Line_6
1 |
| gptkbp:location |
gptkb:Dhaka
|
| gptkbp:numberOfStations |
16
|
| gptkbp:opened |
2022
|
| gptkbp:operator |
gptkb:Dhaka_Mass_Transit_Company_Limited
|
| gptkbp:planned_lines |
gptkb:MRT_Line_1
gptkb:MRT_Line_2 gptkb:MRT_Line_4 gptkb:MRT_Line_5 |
| gptkbp:project_cost_(USD) |
2.8 billion
|
| gptkbp:projected_daily_ridership |
500,000
|
| gptkbp:start_station_(Line_6) |
gptkb:Uttara_North
|
| gptkbp:top_speed_(km/h) |
100
|
| gptkbp:trackGauge |
standard gauge
|
| gptkbp:type |
elevated
|
| gptkbp:website |
https://dmtcl.gov.bd/
|
| gptkbp:bfsParent |
gptkb:Metrorail
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Metrorail (Dhaka)
|