Statements (22)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_station
|
| gptkbp:color |
Red
|
| gptkbp:connects |
gptkb:Mumbai_Metro_Line_7
|
| gptkbp:country |
gptkb:India
|
| gptkbp:electrification |
25 kV AC overhead
|
| gptkbp:endPoint |
gptkb:Mira_Bhayandar
|
| gptkbp:gauge |
standard gauge
|
| gptkbp:length |
11.4 km
|
| gptkbp:location |
gptkb:Mumbai
|
| gptkbp:numberOfStations |
10
|
| gptkbp:operator |
gptkb:Mumbai_Metropolitan_Region_Development_Authority
|
| gptkbp:owner |
gptkb:Mumbai_Metropolitan_Region_Development_Authority
|
| gptkbp:partOf |
gptkb:Mumbai_Metro
|
| gptkbp:plannedOpening |
2025
|
| gptkbp:projectCost |
Rs 6,607 crore
|
| gptkbp:serves |
gptkb:Western_Suburbs
|
| gptkbp:startPoint |
gptkb:Dahisar_East
|
| gptkbp:status |
under construction
|
| gptkbp:type |
elevated
|
| gptkbp:bfsParent |
gptkb:Mira-Bhayandar
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Mumbai Metro Line 9
|