Statements (32)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_station
|
| gptkbp:color |
red
|
| gptkbp:connects |
gptkb:Andheri
gptkb:Dahisar gptkb:Goregaon gptkb:Jogeshwari gptkb:Western_Express_Highway Gundavali |
| gptkbp:constructionStartYear |
2016
|
| gptkbp:country |
gptkb:India
|
| gptkbp:electrification |
25 kV AC overhead catenary
|
| gptkbp:elevatedIn |
yes
|
| gptkbp:endPoint |
Gundavali
|
| gptkbp:intersects |
gptkb:Dahisar_East
gptkb:Mumbai_Metro_Line_2A Gundavali |
| gptkbp:length |
16.5 km
|
| gptkbp:location |
gptkb:Mumbai
|
| gptkbp:numberOfStations |
13
|
| gptkbp:opened |
2023
|
| gptkbp:operator |
gptkb:Mumbai_Metropolitan_Region_Development_Authority
|
| gptkbp:partOf |
gptkb:Mumbai_Metro
|
| gptkbp:projectCost |
INR 6,208 crore
|
| gptkbp:startPoint |
gptkb:Dahisar_East
|
| gptkbp:status |
operational
|
| gptkbp:trackGauge |
standard gauge
|
| gptkbp:type |
rapid transit
|
| gptkbp:bfsParent |
gptkb:Mira-Bhayandar
gptkb:Dahisar_Depot gptkb:Western_Express_Highway |
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Mumbai Metro Line 7
|