gptkbp:instance_of
|
gptkb:Metroplex
|
gptkbp:accessibility
|
Escalators
Elevators
Wheelchair ramps
|
gptkbp:annual_ridership
|
600,000 passengers
|
gptkbp:average_speed
|
34 km/h
|
gptkbp:connects
|
Dahisar East
Mogra
|
gptkbp:construction_cost
|
₹6,500 crore
|
gptkbp:construction_started
|
gptkb:2016
|
gptkbp:electrification
|
1500 V DC
|
gptkbp:environmental_impact
|
Noise reduction
Reduced traffic congestion
Lower emissions
|
gptkbp:expansion_plans
|
Line 7 A
|
gptkbp:future_plans
|
Additional lines
Integration with suburban rail
Expansion to Thane
|
https://www.w3.org/2000/01/rdf-schema#label
|
Mumbai Metro Line 7
|
gptkbp:is_tested_for
|
Phase 1
|
gptkbp:length
|
20.3 km
|
gptkbp:max_speed
|
80 km/h
|
gptkbp:next_station
|
Dahisar East
|
gptkbp:opened
|
2020-01-19
|
gptkbp:operated_by
|
gptkb:Mumbai_Metro_Rail_Corporation
|
gptkbp:operator
|
gptkb:MMRDA
|
gptkbp:part_of
|
gptkb:Mumbai_Metro
|
gptkbp:rolling_stock
|
gptkb:Bombardier
|
gptkbp:route
|
gptkb:Line_7
|
gptkbp:safety_features
|
Fire alarms
Automatic train control
CCTV surveillance
Emergency exits
Passenger information system
|
gptkbp:service_type
|
Rapid transit
|
gptkbp:stations
|
gptkb:13
DN Nagar
Goregaon East
Aarey Colony
Dindoshi
Oshiwara
Bangur Nagar
Malad West
Dahisar East
Mogra
Kandarpada
Goregaon West
Azad Nagar
|
gptkbp:type
|
Elevated
|
gptkbp:bfsParent
|
gptkb:RInfra
|
gptkbp:bfsLayer
|
8
|