Zhengzhou–Xuzhou High-Speed Railway

GPTKB entity

Properties (49)
Predicate Object
gptkbp:instanceOf high-speed railway
gptkbp:constructionMaterial cut-and-cover
around 50 billion yuan
gptkbp:constructionStarted 2010
gptkbp:culturalImpact promotes tourism
enhances cultural exchange
gptkbp:electrification yes
gptkbp:environmentalImpact reduced travel emissions
gptkbp:futurePlans sustainability initiatives
enhanced safety measures
introduction of new train models
upgrades to infrastructure
increased capacity for passengers
improvements in service quality
expansion to more cities
planned to connect with other high-speed lines
https://www.w3.org/2000/01/rdf-schema#label Zhengzhou–Xuzhou High-Speed Railway
gptkbp:impact boosts regional economy
gptkbp:integration integrated with local transport systems
gptkbp:length around 350 km
gptkbp:maxSpeed 350 km/h
gptkbp:opened 2016
gptkbp:operatesIn gptkb:Xuzhou
gptkb:Zhengzhou
gptkbp:operator gptkb:China_Railway_Corporation
gptkbp:partOf gptkb:China's_high-speed_rail_network
gptkbp:passengerCapacity high
limited
luggage assistance
restroom facilities
food and beverage options
Wi-Fi available
waiting lounges
gptkbp:safetyFeatures advanced signaling systems
gptkbp:serves gptkb:Henan_Province
gptkb:Jiangsu_Province
gptkbp:services frequent services
gptkbp:significance connects_major_cities_in_central_and_eastern_China
gptkbp:stations gptkb:Huanghuai_Station
gptkb:Zhengzhou_East_Station
gptkb:Laiwu_Station
gptkb:Jiaozuo_Station
gptkb:Suxian_Station
gptkb:Shangqiu_Station
gptkb:Xuzhou_East_Station
gptkb:Xiangyin_Station
gptkbp:toll ticket prices vary
gptkbp:track 1435 mm (standard gauge)
gptkbp:travelTime approximately 1.5 hours