Tuyến số 1 (Bến Thành – Suối Tiên)
GPTKB entity
Statements (23)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:railway_station
|
gptkbp:color |
blue
|
gptkbp:country |
gptkb:Vietnam
|
gptkbp:electrification |
overhead catenary
|
gptkbp:endPoint |
Suối Tiên
|
https://www.w3.org/2000/01/rdf-schema#label |
Tuyến số 1 (Bến Thành – Suối Tiên)
|
gptkbp:length |
19.7 km
|
gptkbp:locatedIn |
gptkb:Ho_Chi_Minh_City
|
gptkbp:mainContractor |
gptkb:Sumitomo_Corporation
gptkb:Cienco_6 |
gptkbp:numberOfDoors |
3
|
gptkbp:numberOfStations |
14
|
gptkbp:operator |
gptkb:Ho_Chi_Minh_City_Urban_Railway_Management_Board
|
gptkbp:partOf |
gptkb:Ho_Chi_Minh_City_Metro
|
gptkbp:plannedOpening |
2024
|
gptkbp:projectCost |
over 43,700 billion VND
|
gptkbp:rollingStock |
gptkb:Hitachi
|
gptkbp:startPoint |
gptkb:Bến_Thành
|
gptkbp:status |
under construction
|
gptkbp:trackGauge |
1,435 mm
|
gptkbp:type |
rapid transit
|
gptkbp:bfsParent |
gptkb:Tuyến_đường_sắt_đô_thị_Thành_phố_Hồ_Chí_Minh
|
gptkbp:bfsLayer |
7
|