Statements (29)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:dam
|
| gptkbp:annualGeneration |
10 TWh
|
| gptkbp:capacity |
2,100 MW
|
| gptkbp:constructionStartYear |
1960
|
| gptkbp:country |
gptkb:Egypt
|
| gptkbp:crosses |
gptkb:Nile_River
|
| gptkbp:designedBy |
gptkb:Hydroproject_Institute_(Soviet_Union)
|
| gptkbp:fundedBy |
gptkb:Soviet_Union
|
| gptkbp:height |
111 meters
|
| gptkbp:impact |
increased agricultural production
reduced Nile flooding environmental changes in Nile Delta |
| gptkbp:impounds |
gptkb:Lake_Nasser
|
| gptkbp:length |
3,830 meters
|
| gptkbp:location |
gptkb:Aswan,_Egypt
|
| gptkbp:mainContractor |
gptkb:Arab_Contractors
|
| gptkbp:notableEvent |
gptkb:Relocation_of_Abu_Simbel_temples
|
| gptkbp:officialName |
gptkb:Aswan_High_Dam
|
| gptkbp:opened |
1970
|
| gptkbp:owner |
gptkb:Government_of_Egypt
|
| gptkbp:precededBy |
gptkb:Aswan_Low_Dam
|
| gptkbp:purpose |
flood control
hydroelectric power irrigation |
| gptkbp:reservoirName |
gptkb:Lake_Nasser
|
| gptkbp:bfsParent |
gptkb:Essam_El_Hadary
gptkb:Essam_El-Hadary |
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
The High Dam
|