Shenyang–Dalian High-Speed Railway
GPTKB entity
Statements (28)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:train
|
| gptkbp:alsoKnownAs |
gptkb:Hada_High-Speed_Railway
|
| gptkbp:connects |
gptkb:Shenyang
gptkb:Anshan gptkb:Dalian gptkb:Liaoyang gptkb:Panjin gptkb:Yingkou |
| gptkbp:constructionStartYear |
2007
|
| gptkbp:country |
gptkb:China
|
| gptkbp:electrification |
25 kV AC
|
| gptkbp:endPoint |
gptkb:Dalian
|
| gptkbp:length |
404 km
|
| gptkbp:locatedIn |
gptkb:Liaoning_Province
|
| gptkbp:maximumSpeed |
350 km/h
|
| gptkbp:notableFeature |
first high-speed rail in China to operate in extremely cold climates
|
| gptkbp:numberOfStations |
16
|
| gptkbp:opened |
2012
|
| gptkbp:operator |
gptkb:China_Railway_High-speed
|
| gptkbp:partOf |
CRH (China Railway High-speed) network
|
| gptkbp:projectCost |
~98 billion yuan
|
| gptkbp:purpose |
passenger transport
freight transport |
| gptkbp:startPoint |
gptkb:Shenyang
|
| gptkbp:trackGauge |
1435 mm
|
| gptkbp:bfsParent |
gptkb:Northeast_China_High-Speed_Rail_Network
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Shenyang–Dalian High-Speed Railway
|