Statements (23)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:railway_station
|
gptkbp:country |
gptkb:Germany
|
gptkbp:electrification |
15 kV AC overhead
|
gptkbp:endPoint |
gptkb:Frankfurt_Süd
|
gptkbp:frequency |
every 15–30 minutes
|
https://www.w3.org/2000/01/rdf-schema#label |
S6 (Rhine-Main S-Bahn)
|
gptkbp:line |
purple
|
gptkbp:logo |
S-Bahn S6 logo.svg
|
gptkbp:numberOfStations |
21
|
gptkbp:operatedBy |
Deutsche Bahn
|
gptkbp:operator |
commuter rail
|
gptkbp:partOf |
gptkb:Rhine-Main_S-Bahn
|
gptkbp:regionServed |
gptkb:Frankfurt_Rhine-Main
|
gptkbp:routeNumber |
645.6
|
gptkbp:servesCity |
gptkb:Frankfurt_am_Main
gptkb:Bad_Vilbel gptkb:Friedberg_(Hessen) |
gptkbp:startPoint |
gptkb:Friedberg_(Hessen)
|
gptkbp:systemLength |
approximately 38 km
|
gptkbp:trackGauge |
standard gauge
|
gptkbp:usesLine |
gptkb:Main-Weser_Railway
|
gptkbp:bfsParent |
gptkb:Frankfurt-Eschersheim_station
|
gptkbp:bfsLayer |
6
|