New Railway Link through the Alps
GPTKB entity
Statements (23)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:railway_line
|
gptkbp:abbreviation |
NRLA
|
gptkbp:Ceneri_Base_Tunnel_opening_year |
2020
|
gptkbp:constructionStartYear |
1996
|
gptkbp:country |
gptkb:Switzerland
|
gptkbp:fundedBy |
gptkb:Swiss_federal_government
|
gptkbp:goal |
increase rail capacity
reduce travel times shift freight from road to rail |
gptkbp:Gotthard_Base_Tunnel_opening_year |
2016
|
https://www.w3.org/2000/01/rdf-schema#label |
New Railway Link through the Alps
|
gptkbp:includes |
gptkb:Ceneri_Base_Tunnel
gptkb:Gotthard_Base_Tunnel gptkb:Lötschberg_Base_Tunnel |
gptkbp:length |
over 150 km
|
gptkbp:Lötschberg_Base_Tunnel_opening_year |
2007
|
gptkbp:notableProject |
base tunnel system
|
gptkbp:operator |
gptkb:Swiss_Federal_Railways
|
gptkbp:purpose |
improve north-south rail transit through the Swiss Alps
|
gptkbp:region |
gptkb:Alps
|
gptkbp:significance |
contains the world's longest railway tunnel (Gotthard Base Tunnel)
|
gptkbp:bfsParent |
gptkb:Ceneri_Base_Tunnel
|
gptkbp:bfsLayer |
7
|