Statements (20)
Predicate | Object |
---|---|
gptkbp:instance_of |
gptkb:cave
|
gptkbp:connects |
Lugano and Bellinzona
|
gptkbp:construction_cost |
1.5 billion CHF
|
gptkbp:construction_started |
gptkb:2006
|
gptkbp:design |
twin-bore tunnel
|
gptkbp:elevation |
550 m above sea level
|
gptkbp:environmental_impact |
mitigated through planning
|
gptkbp:geological_challenges |
soft ground
|
https://www.w3.org/2000/01/rdf-schema#label |
Ceneri Base Tunnel
|
gptkbp:length |
15.4 km
|
gptkbp:location |
gptkb:Switzerland
|
gptkbp:opened |
gptkb:2020
|
gptkbp:operator |
gptkb:Swiss_Federal_Railways
|
gptkbp:part_of |
gptkb:Gotthard_Base_Tunnel
|
gptkbp:safety_features |
emergency exits
|
gptkbp:significance |
improves rail transport
|
gptkbp:supports |
200 trains per day
|
gptkbp:tunnel_boring_machines_used |
2
|
gptkbp:bfsParent |
gptkb:Alp_Transit_project
|
gptkbp:bfsLayer |
7
|