gptkbp:instanceOf
|
gptkb:railway_station
|
gptkbp:alsoKnownAs
|
Colaba-Bandra-SEEPZ Line
|
gptkbp:connects
|
gptkb:SEEPZ
gptkb:Colaba
gptkb:Bandra
Airport (Domestic and International Terminals)
|
gptkbp:country
|
gptkb:India
|
gptkbp:depot
|
gptkb:Aarey_Colony
|
gptkbp:electrification
|
25 kV AC overhead catenary
|
gptkbp:endPoint
|
gptkb:Aarey_Colony
|
gptkbp:fundedBy
|
gptkb:Japan_International_Cooperation_Agency_(JICA)
|
gptkbp:gauge
|
standard gauge
|
https://www.w3.org/2000/01/rdf-schema#label
|
Mumbai Metro Line 3
|
gptkbp:length
|
33.5 km
|
gptkbp:location
|
gptkb:Mumbai
|
gptkbp:numberOfStations
|
27
|
gptkbp:operator
|
gptkb:Mumbai_Metro_Rail_Corporation_Limited
|
gptkbp:partOf
|
Mumbai Metro Master Plan
|
gptkbp:plannedDailyRidership
|
1.6 million
|
gptkbp:plannedOpening
|
2024
|
gptkbp:projectCost
|
over ₹30,000 crore
|
gptkbp:purpose
|
reduce road congestion
connect business districts
|
gptkbp:startPoint
|
gptkb:Cuffe_Parade
|
gptkbp:startYear
|
2016
|
gptkbp:status
|
under construction
|
gptkbp:system
|
gptkb:Mumbai_Metro
|
gptkbp:type
|
underground
|
gptkbp:bfsParent
|
gptkb:Mira-Bhayandar
|
gptkbp:bfsLayer
|
5
|