gptkbp:instanceOf
|
gptkb:railway_station
|
gptkbp:character
|
elevated
|
gptkbp:connects
|
gptkb:Eastern_Suburbs
gptkb:Mankhurd
gptkb:Mandale
gptkb:Bandra
gptkb:Chembur
gptkb:Kurla
gptkb:Western_Suburbs
|
gptkbp:electrification
|
25 kV AC overhead catenary
|
gptkbp:endPoint
|
gptkb:Mandale
|
gptkbp:gauge
|
standard gauge
|
https://www.w3.org/2000/01/rdf-schema#label
|
Mumbai Metro Line 2B
|
gptkbp:intersects
|
gptkb:Mankhurd
gptkb:Bandra
gptkb:Chembur
gptkb:Kurla
gptkb:DN_Nagar
|
gptkbp:length
|
23.643 km
|
gptkbp:line
|
yellow
|
gptkbp:location
|
Mumbai, Maharashtra, India
|
gptkbp:mainCorridor
|
Dahisar East to Mandale (Line 2)
|
gptkbp:numberOfStations
|
20
|
gptkbp:operator
|
gptkb:Mumbai_Metro_Rail_Corporation
|
gptkbp:owner
|
gptkb:Mumbai_Metropolitan_Region_Development_Authority
|
gptkbp:partOf
|
gptkb:Mumbai_Metro
|
gptkbp:plannedDepot
|
Mandale Depot
|
gptkbp:plannedOpening
|
2025
|
gptkbp:plannedRollingStock
|
6-car trains
|
gptkbp:projectCost
|
INR 10,986 crore
|
gptkbp:startPoint
|
gptkb:DN_Nagar
|
gptkbp:status
|
under construction
|
gptkbp:system
|
gptkb:Mumbai_Metro
|
gptkbp:website
|
https://mmrda.maharashtra.gov.in/metro-line-2b
|
gptkbp:bfsParent
|
gptkb:Mira-Bhayandar
|
gptkbp:bfsLayer
|
5
|