Missouri River Lock and Dam No. 35
GPTKB entity
Properties (50)
Predicate | Object |
---|---|
gptkbp:instanceOf |
Lock and Dam
|
gptkbp:annualVisitors |
100,000 megawatt-hours
|
gptkbp:capacity |
100,000 cubic feet per second
|
gptkbp:communityImpact |
Economic benefits
Recreation opportunities |
gptkbp:constructedIn |
1964
|
gptkbp:constructionMaterial |
Reinforced concrete
|
gptkbp:electrification |
Hydroelectric powerhouse
|
gptkbp:emergencyServices |
Flood response plan
|
gptkbp:engineType |
gptkb:Francis_turbines
|
gptkbp:environmentalImpact |
Altered river ecosystem
Fish migration barriers |
gptkbp:flag |
110 feet wide
600 feet long |
gptkbp:function |
Flood control
Hydroelectric power generation Navigation |
gptkbp:hasCapacity |
30 megawatts
|
gptkbp:height |
50 feet
|
gptkbp:historicalEvent |
Environmental assessments conducted
Major renovations in 2000s Flood events managed Construction completion in 1964 Hydroelectric generation started |
gptkbp:historicalSignificance |
Part of the Pick-Sloan Plan
|
https://www.w3.org/2000/01/rdf-schema#label |
Missouri River Lock and Dam No. 35
|
gptkbp:is_monitored_by |
Structural health monitoring
Water quality monitoring |
gptkbp:length |
1,200 feet
|
gptkbp:lighting |
50,000 acre-feet
|
gptkbp:locatedIn |
gptkb:Missouri
|
gptkbp:maintenance |
Regular inspections
Repairs as needed |
gptkbp:navigationEquipment |
Single lock chamber
|
gptkbp:operatedBy |
gptkb:U.S._Army_Corps_of_Engineers
|
gptkbp:partOf |
gptkb:Missouri_River
|
gptkbp:publicAccess |
Visitor center
Recreational areas |
gptkbp:regulatoryCompliance |
gptkb:Federal_Energy_Regulatory_Commission
gptkb:U.S._Army_Corps_of_Engineers |
gptkbp:relatedPatent |
Flood control projects in the region
Missouri_River_navigation_improvements Other_dams_on_Missouri_River |
gptkbp:reservoir |
gptkb:Lake_Francis_Case
|
gptkbp:river |
gptkb:Missouri_River
|
gptkbp:safetyFeatures |
Warning systems
Fish ladders |
gptkbp:spillwayType |
Emergency spillway
Service spillway |
gptkbp:type |
Concrete gravity dam
|