Statements (104)
Predicate | Object |
---|---|
gptkbp:instance_of |
gptkb:cave
|
gptkbp:academic_programs |
designed by a consortium
responsible for design |
gptkbp:accessibility |
improved over time
|
gptkbp:breathability |
mechanical
|
gptkbp:challenges |
overcome during construction
riverbed geology |
gptkbp:community_events |
held to promote awareness
|
gptkbp:community_impact |
gptkb:significant
improved access to services |
gptkbp:connects |
gptkb:Wirral
gptkb:Liverpool |
gptkbp:construction_cost |
£10 million
approximately £3 million |
gptkbp:construction_material |
reinforced concrete
|
gptkbp:construction_method |
excavation
tunneling machine used |
gptkbp:construction_started |
gptkb:1966
gptkb:1971 1925 9 years 5 years from start to finish |
gptkbp:cultural_references |
featured in media
featured in local media |
gptkbp:depth |
approximately 75 feet
approximately 30 meters below the river |
gptkbp:design |
cut-and-cover
|
gptkbp:emergency_exits |
available
provided |
gptkbp:emergency_services |
2
available accessible conducted regularly optimized held periodically under 10 minutes |
gptkbp:employees |
over 1,000 employed
|
gptkbp:enforces |
monitored
reported and analyzed |
gptkbp:environmental_concerns |
complied with during construction
|
gptkbp:environmental_impact |
studied
studies conducted |
gptkbp:features |
two lanes of traffic
|
gptkbp:future_plans |
expansion considered
expansion considerations |
gptkbp:has_public_transport |
limited
not allowed limited connections available |
gptkbp:has_toll |
yes
automated vary by vehicle type automated systems used |
gptkbp:historical_event |
celebrated anniversaries
|
gptkbp:historical_significance |
part of regional infrastructure
first road tunnel under the River Mersey |
https://www.w3.org/2000/01/rdf-schema#label |
Mersey Tunnel
|
gptkbp:landmarks |
visible from tunnel
|
gptkbp:length |
2.1 miles
|
gptkbp:lighting |
artificial
LED lights installed |
gptkbp:local_attractions |
nearby waterfront parks
|
gptkbp:local_economy |
boosted by improved transport links
supported by traffic |
gptkbp:local_government |
gptkb:Merseyside_County_Council
|
gptkbp:location |
gptkb:Merseyside,_England
|
gptkbp:maintenance |
gptkb:Mersey_Tunnel_Act_1971
ongoing regularly updated regular inspections conducted |
gptkbp:opened |
gptkb:Queen_Elizabeth_II
gptkb:1971 gptkb:King_George_V 1934 |
gptkbp:operated_by |
gptkb:Merseytravel
|
gptkbp:parking |
not allowed
|
gptkbp:passenger_traffic |
motor vehicles
CCTV monitoring implemented over 10 million vehicles annually monitored annually over 10 million vehicles monitored electronically one-way system during peak hours |
gptkbp:public_art |
installed in areas
|
gptkbp:public_awareness |
conducted for safety
|
gptkbp:public_perception |
generally positive
|
gptkbp:public_reaction |
generally positive
|
gptkbp:related_vehicle |
monitored for safety
|
gptkbp:renovation |
periodic
ongoing maintenance work |
gptkbp:route |
gptkb:Mersey_Ferry
|
gptkbp:safety |
prioritized
conducted regularly. |
gptkbp:safety_features |
fire suppression system
fire suppression systems |
gptkbp:significance |
major transport link
major transport route |
gptkbp:toll_booths |
located at both ends
located at entrances |
gptkbp:tourist_attraction |
occasionally visited
|
gptkbp:type |
gptkb:cave
|
gptkbp:used_for |
commuting
|
gptkbp:bfsParent |
gptkb:River_Mersey
|
gptkbp:bfsLayer |
4
|