Kingsway Tunnel

GPTKB entity

Statements (49)
Predicate Object
gptkbp:instanceOf tunnel
gptkbp:aroma mechanical ventilation
gptkbp:built 1966
5 years
bored tunnel
gptkbp:community_impact evaluated
gptkbp:connects Liverpool_to_Wirral
gptkbp:construction_cost £20 million
gptkbp:constructionMaterial reinforced concrete
gptkbp:depth approximately 30 meters
gptkbp:design cut-and-cover
gptkbp:design_feature aesthetic considerations
gptkbp:emergencyServices available
conducted regularly
under 5 minutes
gptkbp:environmental_impact studied
assessed
gptkbp:environmentalProtection implemented
gptkbp:features two lanes in each direction
gptkbp:futurePlans planned.
https://www.w3.org/2000/01/rdf-schema#label Kingsway Tunnel
gptkbp:is_part_of A59 road
gptkbp:landmark important infrastructure
gptkbp:length 2.1 miles
gptkbp:lighting LED lights
gptkbp:location gptkb:Liverpool,_England
gptkbp:maintenance ongoing
gptkbp:opened 1971
gptkbp:openedIn Queen Elizabeth II
gptkbp:owner gptkb:Highways_England
gptkbp:passenger_traffic motor vehicles
in place
approximately 40,000 vehicles per day
optimized
gptkbp:productionCompany over 1,000
gptkbp:provides_access_to 24/7
gptkbp:public_transport_access limited
gptkbp:renovated completed in 2010
gptkbp:rootSystem 3.4 kilometers
7.3 meters
gptkbp:safety_features CCTV_monitoring
gptkbp:safetyFeatures monitored
implemented
gptkbp:significance major transport route
gptkbp:toll no
not present
gptkbp:tour scheduled
gptkbp:trainTypes monitored
gptkbp:type road tunnel