gptkbp:instance_of
|
gptkb:Lock
|
gptkbp:capacity
|
600,000 cubic feet per second
|
gptkbp:challenges
|
river conditions
|
gptkbp:climate_impact
|
monitored for changes
|
gptkbp:collaboration
|
works with neighboring states.
|
gptkbp:community_engagement
|
public meetings held
|
gptkbp:community_feedback
|
gathered from public surveys
|
gptkbp:community_impact
|
supports local economy
|
gptkbp:community_outreach
|
engages with local schools
|
gptkbp:community_partnerships
|
works with local governments
|
gptkbp:community_service
|
supports local infrastructure
|
gptkbp:constructed_in
|
concrete and steel
|
gptkbp:construction_material
|
reinforced concrete
|
gptkbp:construction_started
|
gptkb:1927
1933
|
gptkbp:cultural_heritage
|
not a historical landmark
|
gptkbp:design
|
vertical lift lock
|
gptkbp:design_features
|
spillway gates
|
gptkbp:educational_programs
|
offers educational tours
|
gptkbp:emergency_services
|
gptkb:U._S._Army_Corps_of_Engineers
conducted regularly
flood response capabilities
|
gptkbp:environmental_impact
|
conducted regularly
affects local ecosystems
|
gptkbp:flood_control
|
yes
|
gptkbp:funding
|
federal and state funding
|
gptkbp:future_plans
|
upgrades and maintenance
|
gptkbp:height
|
30 feet
|
gptkbp:historical_event
|
floods in the region
|
gptkbp:historical_records
|
maintained by U. S. Army Corps of Engineers
|
gptkbp:historical_significance
|
important for regional development
critical for shipping
part of the Illinois Waterway
|
https://www.w3.org/2000/01/rdf-schema#label
|
Marseilles Lock and Dam
|
gptkbp:is_monitored_by
|
conducted by environmental agencies
real-time water level monitoring
|
gptkbp:key_concept
|
24/7 operation
110 feet wide
|
gptkbp:length
|
1,200 feet
|
gptkbp:location
|
gptkb:Marseilles,_Illinois
|
gptkbp:lockage_fees
|
applies to commercial vessels
|
gptkbp:maintenance
|
gptkb:U._S._Army_Corps_of_Engineers
|
gptkbp:navigation_improvements
|
enhanced river navigation
|
gptkbp:navigation_system
|
March to December
|
gptkbp:number_of_rooms
|
gptkb:1
|
gptkbp:opened
|
1933
|
gptkbp:operating_hours
|
varies seasonally
|
gptkbp:operator
|
gptkb:U._S._Army_Corps_of_Engineers
|
gptkbp:partnerships
|
collaborates with local agencies
|
gptkbp:power_source
|
no
|
gptkbp:public_access
|
accessible to visitors
|
gptkbp:purpose
|
gptkb:navigation
|
gptkbp:recreation
|
fishing and boating
|
gptkbp:reservoir
|
Marseilles Pool
|
gptkbp:river
|
gptkb:Illinois_River
|
gptkbp:safety
|
emergency preparedness plans
|
gptkbp:safety_features
|
safety gates
|
gptkbp:safety_measures
|
complies with federal regulations
|
gptkbp:sustainability_efforts
|
focus on environmental sustainability
|
gptkbp:visitors
|
public access available
|
gptkbp:water_management
|
yes
integrated with regional plans
|
gptkbp:water_quality
|
monitored regularly
|
gptkbp:waterway_connections
|
connects to other waterways
|
gptkbp:waterway_management
|
part of Illinois Waterway system
|
gptkbp:waterway_safety
|
promotes safe navigation practices
|
gptkbp:wildlife
|
habitat alteration
|
gptkbp:bfsParent
|
gptkb:Illinois_Waterway
|
gptkbp:bfsLayer
|
7
|