Properties (51)
Predicate | Object |
---|---|
gptkbp:instanceOf |
Mass transit line
|
gptkbp:accessibility |
Elevators and ramps
|
gptkbp:annualRidership |
200,000 passengers
|
gptkbp:colors |
Purple
|
gptkbp:communityFeedback |
Generally positive
|
gptkbp:communityImpact |
Improved access to public transport
|
gptkbp:connects |
gptkb:MRT_Line_7
gptkb:MRT_Line_9 |
gptkbp:constructionMaterial |
2021
Cut-and-cover |
gptkbp:constructionStarted |
2018
|
gptkbp:design |
Underground_and_elevated_sections
|
gptkbp:drivetrain |
12:00 AM
5:30 AM |
gptkbp:electrification |
Third rail
|
gptkbp:emergencyServices |
Regular drills conducted
|
gptkbp:environmentalImpact |
Reduced traffic congestion
|
gptkbp:funding |
Government funded
|
gptkbp:futurePlans |
Expansion to neighboring regions
Planned to extend to the north |
https://www.w3.org/2000/01/rdf-schema#label |
MRT Line 8
|
gptkbp:integration |
Yes
|
gptkbp:length |
20 kilometers
|
gptkbp:location |
gptkb:Singapore
|
gptkbp:maintenance |
Depot located at the end of the line
|
gptkbp:notableFeature |
gptkb:Interchange_with_Line_6
Interchange_with_Line_3 Interchange_with_Line_1 Interchange_with_Line_2 Interchange_with_Line_4 Interchange_with_Line_5 Interchange_with_Line_7 Interchange_with_Line_8 Interchange_with_Line_9 |
gptkbp:numberOfStations |
12
|
gptkbp:opened |
2022
|
gptkbp:operatedBy |
gptkb:Mass_Rapid_Transit_Corporation
|
gptkbp:originalNetwork |
gptkb:Singapore_MRT_network
|
gptkbp:project |
4 years
$1 billion |
gptkbp:safetyFeatures |
CCTV surveillance
|
gptkbp:serviceArea |
Urban_and_suburban_areas
|
gptkbp:services |
Daily service
|
gptkbp:serviceType |
Rapid transit
|
gptkbp:speed |
40 km/h
|
gptkbp:technology |
Smart signaling systems
|
gptkbp:ticketingSystem |
Contactless smart card
|
gptkbp:track |
1435 mm
|
gptkbp:training |
5 minutes
1000 passengers per train |
gptkbp:trainTypes |
Electric multiple unit
|