Statements (28)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:Metro_line
|
| gptkbp:alsoKnownAs |
gptkb:Swami_Samarth_Nagar–Vikhroli_Metro_Corridor
|
| gptkbp:connects |
gptkb:JVLR
gptkb:Swami_Samarth_Nagar gptkb:Jogeshwari gptkb:Vikhroli |
| gptkbp:country |
gptkb:India
|
| gptkbp:electrification |
25 kV AC overhead catenary
|
| gptkbp:endPoint |
gptkb:Vikhroli
|
| gptkbp:expectedCompletion |
2025
|
| gptkbp:foundationStoneLaidBy |
December 2016
|
| gptkbp:gauge |
Standard gauge
|
| gptkbp:length |
14.47 km
|
| gptkbp:location |
gptkb:Mumbai
|
| gptkbp:numberOfStations |
13
|
| gptkbp:operator |
gptkb:Mumbai_Metro_Rail_Corporation
|
| gptkbp:owner |
gptkb:Mumbai_Metropolitan_Region_Development_Authority
|
| gptkbp:partOf |
gptkb:Mumbai_Metro
|
| gptkbp:plannedOpening |
2025
|
| gptkbp:projectCost |
Rs 6,700 crore
|
| gptkbp:serves |
gptkb:Eastern_Suburbs
gptkb:Western_Suburbs |
| gptkbp:startPoint |
gptkb:Swami_Samarth_Nagar
|
| gptkbp:status |
Under construction
|
| gptkbp:type |
Elevated
|
| gptkbp:bfsParent |
gptkb:Line_6
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
Line 6 (Mumbai Metro)
|