Statements (28)
| Predicate | Object | 
|---|---|
| gptkbp:instanceOf | gptkb:railway_line | 
| gptkbp:bridgeCount | 47 | 
| gptkbp:constructionStartYear | 2014 | 
| gptkbp:country | gptkb:China | 
| gptkbp:electrification | 25 kV AC | 
| gptkbp:endPoint | gptkb:Nyingchi | 
| gptkbp:gauge | standard gauge | 
| gptkbp:length | 435 km | 
| gptkbp:locatedIn | gptkb:Tibet_Autonomous_Region | 
| gptkbp:maximumSpeed | 160 km/h | 
| gptkbp:notableBattle | gptkb:Milin_Tunnel | 
| gptkbp:notableBuilding | gptkb:Yarlung_Tsangpo_River_Bridge | 
| gptkbp:notableFor | first electrified railway in Tibet high-altitude railway | 
| gptkbp:numberOfStations | 9 | 
| gptkbp:opened | 2021 | 
| gptkbp:operator | gptkb:China_State_Railway_Group | 
| gptkbp:partOf | gptkb:Sichuan–Tibet_railway | 
| gptkbp:passesThrough | gptkb:Milin gptkb:Shannan gptkb:Gonggar | 
| gptkbp:purpose | passenger transport freight transport | 
| gptkbp:startPoint | gptkb:Lhasa | 
| gptkbp:tunnelCount | 121 | 
| gptkbp:bfsParent | gptkb:T36_Tunnel | 
| gptkbp:bfsLayer | 7 | 
| https://www.w3.org/2000/01/rdf-schema#label | Lhasa–Nyingchi railway |