Kalyan–Kalyan Kalyan Shilphata line
GPTKB entity
Statements (49)
Predicate | Object |
---|---|
gptkbp:instanceOf |
railway line
|
gptkbp:annualVisitors |
approximately 50,000
|
gptkbp:benefits |
commuters_in_Thane
|
gptkbp:built |
IRCON International
|
gptkbp:communityImpact |
job creation
access to healthcare reduced traffic congestion social inclusion increased property values environmental benefits access to education improved local economy better connectivity enhanced public transport options cultural_exchange |
gptkbp:connects |
gptkb:Kalyan_Junction
Shilphata |
gptkbp:constructionMaterial |
2019
|
gptkbp:constructionStarted |
2015
|
gptkbp:drivetrain |
Kalyan_to_Shilphata
Shilphata_to_Kalyan |
gptkbp:electrification |
Yes
|
gptkbp:environmentalImpact |
minimal
|
gptkbp:funding |
gptkb:Indian_government
|
gptkbp:futurePlans |
Kalyan_to_Ambernath
extension_to_Navi_Mumbai |
https://www.w3.org/2000/01/rdf-schema#label |
Kalyan–Kalyan Kalyan Shilphata line
|
gptkbp:is_integrated_with |
Mumbai_local_train_network
|
gptkbp:length |
approximately 20 km
|
gptkbp:opened |
2020
|
gptkbp:operatedBy |
gptkb:Central_Railway
|
gptkbp:partOf |
gptkb:Mumbai_Suburban_Railway
|
gptkbp:passengerCapacity |
food stalls
restrooms waiting areas information kiosks water dispensers |
gptkbp:project |
₹500 crore
|
gptkbp:safetyFeatures |
CCTV surveillance
|
gptkbp:serves |
Thane_district
|
gptkbp:serviceType |
local trains
|
gptkbp:significance |
reduces travel time
|
gptkbp:speed |
60 km/h
|
gptkbp:stations |
Kalyan
Shilphata |
gptkbp:ticketingSystem |
Automatic ticket vending machines
|
gptkbp:track |
Broad gauge
|
gptkbp:training |
every 15 minutes
|
gptkbp:type |
suburban railway
|