Jurong Regional Line (future)
GPTKB entity
Statements (31)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_line
|
| gptkbp:announced |
gptkb:Land_Transport_Authority
|
| gptkbp:color |
Turquoise
|
| gptkbp:connectsTo |
gptkb:Downtown_Line
gptkb:East_West_Line gptkb:Cross_Island_Line gptkb:North_South_Line |
| gptkbp:depot |
gptkb:Tengah_Depot
|
| gptkbp:electrification |
750 V DC third rail
|
| gptkbp:location |
gptkb:Singapore
|
| gptkbp:numberOfStations |
24
|
| gptkbp:operator |
gptkb:SMRT_Trains
|
| gptkbp:phase1Opening |
2027
|
| gptkbp:phase2Opening |
2028
|
| gptkbp:phase3Opening |
2029
|
| gptkbp:plannedOpening |
2027
|
| gptkbp:plannedPhases |
3
|
| gptkbp:rollingStock |
gptkb:Alstom_Movia_R151
|
| gptkbp:servesArea |
gptkb:Jurong_East
gptkb:NTU gptkb:Jurong_West gptkb:Boon_Lay gptkb:Choa_Chu_Kang gptkb:Tengah |
| gptkbp:status |
Under construction
|
| gptkbp:system |
gptkb:Singapore_MRT
|
| gptkbp:trackGauge |
Standard gauge
|
| gptkbp:type |
Rapid transit
|
| gptkbp:bfsParent |
gptkb:Jurong,_Singapore
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Jurong Regional Line (future)
|