Jinan-Zaozhuang High-Speed Railway
GPTKB entity
Statements (69)
Predicate | Object |
---|---|
gptkbp:instanceOf |
high-speed railway
|
gptkbp:constructionStarted |
2010
2014 |
gptkbp:designedBy |
gptkb:China_Railway_Corporation
|
gptkbp:electrification |
Yes
|
https://www.w3.org/2000/01/rdf-schema#label |
Jinan-Zaozhuang High-Speed Railway
|
gptkbp:length |
approximately 150 kilometers
|
gptkbp:maxSpeed |
350 km/h
|
gptkbp:opened |
December 26, 2014
|
gptkbp:operatesIn |
gptkb:Zaozhuang
Jinan |
gptkbp:operator |
gptkb:China_Railway_High-speed
|
gptkbp:partOf |
gptkb:China's_high-speed_rail_network
|
gptkbp:route |
G2001
G2003 G2005 G2007 G2009 G2011 G2013 G2015 G2017 G2021 G2025 G2027 G2031 G2033 G2037 G2041 G2043 G2045 G2047 G2049 G2051 G2053 G2055 G2057 G2059 G2061 G2063 G2065 G2067 G2069 G2071 G2075 G2077 G2079 G2083 G2085 G2087 G2091 G2093 G2095 G2097 G2019 G2023 G2029 G2035 G2039 G2073 G2081 G2089 G2099 |
gptkbp:serves |
gptkb:Shandong_Province
|
gptkbp:serviceType |
passenger service
|
gptkbp:stations |
gptkb:Zaozhuang_East_Station
gptkb:Jinan_East_Station |
gptkbp:track |
1,435 mm (standard gauge)
|
gptkbp:travelTime |
about 50 minutes
|