Statements (29)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_station
|
| gptkbp:announced |
2014
|
| gptkbp:color |
green
|
| gptkbp:connects |
gptkb:Thane
gptkb:Ghatkopar gptkb:Mulund gptkb:Wadala Kasarvadavali |
| gptkbp:country |
gptkb:India
|
| gptkbp:electrification |
25 kV AC overhead catenary
|
| gptkbp:endPoint |
Kasarvadavali
|
| gptkbp:expectedCompletion |
2024
|
| gptkbp:foundationStoneLaidBy |
2016
|
| gptkbp:gauge |
standard gauge
|
| gptkbp:length |
32.32 km
|
| gptkbp:location |
gptkb:Mumbai
|
| gptkbp:numberOfStations |
32
|
| gptkbp:operator |
gptkb:Mumbai_Metro_Rail_Corporation
|
| gptkbp:owner |
gptkb:Mumbai_Metropolitan_Region_Development_Authority
|
| gptkbp:partOf |
gptkb:Mumbai_Metro
|
| gptkbp:plannedOpening |
2024
|
| gptkbp:projectCost |
₹14,549 crore
|
| gptkbp:serves |
gptkb:Eastern_Suburbs_of_Mumbai
|
| gptkbp:startPoint |
gptkb:Wadala
|
| gptkbp:status |
under construction
|
| gptkbp:type |
rapid transit
|
| gptkbp:bfsParent |
gptkb:Asian_Infrastructure_Investment_Bank
|
| gptkbp:bfsLayer |
6
|
| https://www.w3.org/2000/01/rdf-schema#label |
India Mumbai Metro Line 4
|