Hubble Servicing Mission 3B

GPTKB entity

Statements (43)
Predicate Object
gptkbp:instanceOf gptkb:satellite
gptkbp:alsoKnownAs gptkb:STS-109
gptkbp:commander gptkb:Scott_Altman
gptkbp:crew 7
gptkbp:duration 10 days, 22 hours, 11 minutes
gptkbp:elevation approx. 570 km
gptkbp:EVAcrew gptkb:John_M._Grunsfeld
gptkb:Michael_J._Massimino
gptkb:James_H._Newman
gptkb:Richard_M._Linnehan
gptkbp:EVAobjective install Advanced Camera for Surveys
install new cooling system for NICMOS
replace Power Control Unit
replace Reaction Wheel Assembly
replace solar arrays
gptkbp:followedBy gptkb:Hubble_Servicing_Mission_4
https://www.w3.org/2000/01/rdf-schema#label Hubble Servicing Mission 3B
gptkbp:inclination 28.5 degrees
gptkbp:landingDate gptkb:Kennedy_Space_Center
gptkbp:launchDate 2002-03-01
gptkbp:launchSite gptkb:Kennedy_Space_Center_LC-39A
gptkbp:launchVehicle gptkb:Space_Shuttle_Columbia
gptkbp:missionSpecialist gptkb:John_M._Grunsfeld
gptkb:Michael_J._Massimino
gptkb:James_H._Newman
gptkb:Richard_M._Linnehan
gptkb:Nancy_J._Currie
gptkbp:missionType servicing mission
gptkbp:NASAmissionID gptkb:STS-109
gptkbp:notableAchievement first time Hubble was powered down in orbit
installation of Advanced Camera for Surveys
longest series of spacewalks for a single shuttle mission at the time
gptkbp:operator gptkb:NASA
gptkbp:partOf Hubble Space Telescope servicing missions
gptkbp:performedEVA 5
gptkbp:pilot gptkb:Duane_G._Carey
gptkbp:precededBy gptkb:Hubble_Servicing_Mission_3A
gptkbp:returnedToEarth 2002-03-12
gptkbp:target gptkb:Hubble_Space_Telescope
gptkbp:bfsParent gptkb:Near_Infrared_Camera_and_Multi-Object_Spectrometer
gptkb:Advanced_Camera_for_Surveys
gptkb:NICMOS_Cooling_System
gptkbp:bfsLayer 6