gptkbp:instanceOf
|
electricity transmission network
|
gptkbp:balancing_authority
|
gptkb:Transmission_System_Operators_(TSOs)
|
gptkbp:challenge
|
grid stability
renewable integration
transmission bottlenecks
|
gptkbp:connectivity
|
gptkb:Austria
gptkb:Belgium
gptkb:Czech_Republic
gptkb:Denmark
gptkb:France
gptkb:Luxembourg
gptkb:Netherlands
gptkb:Poland
gptkb:Switzerland
|
gptkbp:connects
|
gptkb:European_interconnected_grid
|
gptkbp:country
|
gptkb:Germany
|
gptkbp:data_transparency
|
gptkb:ENTSO-E_Transparency_Platform
|
gptkbp:demand_response
|
increasing
|
gptkbp:frequency
|
50 Hz
|
gptkbp:historicalEvent
|
coal phase-out
nuclear phase-out
|
https://www.w3.org/2000/01/rdf-schema#label
|
German power grid
|
gptkbp:integration
|
gptkb:Energiewende
|
gptkbp:length
|
over 35,000 km (extra-high voltage)
|
gptkbp:market
|
European electricity market
|
gptkbp:operator
|
gptkb:TenneT
gptkb:Amprion
gptkb:TransnetBW
gptkb:50Hertz
|
gptkbp:ownedBy
|
public and private companies
|
gptkbp:planned_project
|
gptkb:A-Nord
gptkb:SuedLink
gptkb:SuedOstLink
gptkb:Ultranet
|
gptkbp:powerSource
|
gptkb:coal
natural gas
nuclear power
renewable energy
hydropower
solar power
wind power
|
gptkbp:regulates
|
gptkb:Bundesnetzagentur
|
gptkbp:smart_grid
|
in development
|
gptkbp:storage_integration
|
battery storage
pumped hydro
|
gptkbp:voltage_level
|
high voltage
extra-high voltage
|
gptkbp:bfsParent
|
gptkb:DolWin2
|
gptkbp:bfsLayer
|
6
|