Statements (18)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:electricity_transmission_project
|
| gptkbp:capacity |
2 GW
|
| gptkbp:country |
gptkb:Germany
|
| gptkbp:endPoint |
Isar, Bavaria
|
| gptkbp:expectedCompletion |
2027
|
| gptkbp:length |
approx. 540 km
|
| gptkbp:operatingSystem |
525 kV
|
| gptkbp:operator |
gptkb:TenneT
gptkb:50Hertz |
| gptkbp:part_of |
German energy transition (Energiewende)
|
| gptkbp:purpose |
transmit renewable energy from north to south Germany
|
| gptkbp:startPoint |
Wolmirstedt, Saxony-Anhalt
|
| gptkbp:status |
under construction
|
| gptkbp:technology |
underground cable
|
| gptkbp:type |
gptkb:high-voltage_direct_current_transmission_line
|
| gptkbp:bfsParent |
gptkb:German_power_grid
|
| gptkbp:bfsLayer |
8
|
| https://www.w3.org/2000/01/rdf-schema#label |
SuedOstLink
|