Bureya Hydroelectric Power Station
GPTKB entity
Properties (61)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:hydroelectric_power_station
|
gptkbp:built |
1994
2003 designed for long lifespan |
gptkbp:collaborations |
involves international collaboration
|
gptkbp:commissioned |
2003
|
gptkbp:community_engagement |
engages with local communities
|
gptkbp:community_impact |
displaces local communities
|
gptkbp:construction_cost |
$1.5 billion
|
gptkbp:controls |
automated control system
|
gptkbp:country |
gptkb:Russia
|
gptkbp:design |
gptkb:Hydroproject_Institute
|
gptkbp:educational_programs |
supports educational programs
|
gptkbp:electrification |
hydropower
|
gptkbp:emissionsStandard |
low
|
gptkbp:employs |
creates jobs
|
gptkbp:energyEfficiency |
promotes energy independence
limited energy storage capacity |
gptkbp:engineType |
9
|
gptkbp:environmental_impact |
mitigates climate change
affects local wildlife flooding of land |
gptkbp:fauna |
yes
|
gptkbp:financials |
financially viable project
|
gptkbp:fuel_capacity |
high energy efficiency
|
gptkbp:futurePlans |
potential for future expansion
|
gptkbp:gridConnection |
gptkb:Siberian_power_grid
contributes to grid stability |
gptkbp:height |
100 m
|
https://www.w3.org/2000/01/rdf-schema#label |
Bureya Hydroelectric Power Station
|
gptkbp:is_a_source_of |
electricity generation
|
gptkbp:length |
1,200 m
|
gptkbp:lighting |
provides flood control
|
gptkbp:local_economy |
boosts local economy
|
gptkbp:location |
Amur_Oblast,_Russia
|
gptkbp:maintenance |
regular maintenance required
|
gptkbp:notableFeature |
part of national energy policy
|
gptkbp:operational_status |
3,015 MW
|
gptkbp:operator |
RusHydro
|
gptkbp:owner |
RusHydro
|
gptkbp:powerOutput |
consistent energy output
distributes power to regions |
gptkbp:productionYears |
15,000 GWh
|
gptkbp:public_perception |
generally positive public perception
|
gptkbp:region |
important for regional development
|
gptkbp:regulatoryBody |
gptkb:Russian_government
|
gptkbp:research_focus |
hydropower research
|
gptkbp:reservoir |
gptkb:Bureya_Reservoir
3,000 million m³ |
gptkbp:safetyFeatures |
has emergency protocols
implemented safety measures |
gptkbp:spillwayType |
gated spillway
|
gptkbp:status |
operational
|
gptkbp:sustainability |
focus on sustainability.
contributes to renewable energy |
gptkbp:technology |
adopts technological advancements
|
gptkbp:tourism |
attracts tourists
|
gptkbp:type |
gravity dam
|
gptkbp:waterManagement |
important for water management
conducted hydrological studies |
gptkbp:waterQuality |
gptkb:Bureya_River
|