gptkbp:instanceOf
|
gptkb:hydroelectric_power_station
|
gptkbp:benefits
|
job creation
|
gptkbp:built
|
1978
1999
21 years
|
gptkbp:capacity
|
435 MW
|
gptkbp:collaborations
|
inter-state cooperation for water management
|
gptkbp:commissioned
|
2000
|
gptkbp:community_impact
|
displacement of local communities
|
gptkbp:construction_cost
|
₹1,200 crore
|
gptkbp:design
|
gptkb:Narmada_Valley_Development_Authority
|
gptkbp:electrification
|
underground powerhouse
hydropower technology
|
gptkbp:emissionsStandard
|
low emissions
|
gptkbp:enginePower
|
6
|
gptkbp:engineType
|
gptkb:Francis_turbine
|
gptkbp:environmental_impact
|
habitat alteration
flooding of land
|
gptkbp:future_plans
|
gptkb:Central_Water_Commission
|
gptkbp:futurePlans
|
possible expansion plans
|
gptkbp:gridConnection
|
Central_Grid
|
gptkbp:headCoach
|
40 meters
|
gptkbp:height
|
65 meters
1,200 meters
|
https://www.w3.org/2000/01/rdf-schema#label
|
Bansagar Hydroelectric Power Station
|
gptkbp:is_a_source_of
|
irrigation
electricity generation
|
gptkbp:isBeneficialFor
|
Madhya Pradesh
|
gptkbp:length
|
1,200 meters
|
gptkbp:lighting
|
yes
|
gptkbp:location
|
Madhya_Pradesh,_India
|
gptkbp:maintenance
|
regular maintenance required
|
gptkbp:operational_area
|
1999
|
gptkbp:operational_status
|
2000
435 MW
|
gptkbp:operator
|
gptkb:Narmada_Valley_Development_Authority
|
gptkbp:owner
|
Government of India
|
gptkbp:powerOutput
|
gptkb:Madhya_Pradesh_State_Electricity_Board
clean energy output
|
gptkbp:produces
|
6
|
gptkbp:productionYears
|
1,500 GWh
|
gptkbp:project
|
multi-purpose project
|
gptkbp:region
|
economic development
|
gptkbp:reservoir
|
gptkb:Bansagar_Dam
1,200 million cubic meters
|
gptkbp:river
|
gptkb:Sone_River
|
gptkbp:service_area
|
1,00,000 hectares
|
gptkbp:spillwayType
|
1,00,000 cusecs
|
gptkbp:sustainability
|
renewable energy source
|
gptkbp:type
|
run-of-the-river
concrete gravity dam
|
gptkbp:unitAwards
|
6 x 150 MW
|
gptkbp:waterManagement
|
controlled release
|
gptkbp:waterQuality
|
gptkb:Sone_River
|