Properties (54)
Predicate | Object |
---|---|
gptkbp:instanceOf |
railway line
|
gptkbp:built |
1856-1859
|
gptkbp:communicationEquipment |
automatic signalling
|
gptkbp:community_impact |
economic development
job creation urban development environmental considerations tourism boost |
gptkbp:electrification |
not electrified
|
gptkbp:frequency |
hourly
|
gptkbp:future_plans |
station upgrades
track upgrades increased service frequency electrification proposals level crossing removals |
gptkbp:has_a |
Melton_Junction
Southern_Cross_Junction Sunshine_Junction |
gptkbp:historical_significance |
Gold Rush era
|
https://www.w3.org/2000/01/rdf-schema#label |
Ballarat railway line
|
gptkbp:infrastructure |
double track
|
gptkbp:length |
113 kilometers
|
gptkbp:location |
gptkb:Victoria,_Australia
|
gptkbp:notableWork |
gptkb:Regional_Rail_Link
gptkb:Melbourne_Metro Western Rail Plan Ballarat_Line_Upgrade |
gptkbp:opened |
1859
|
gptkbp:operates_in |
gptkb:Victorian_Railways
|
gptkbp:operator |
V/Line
|
gptkbp:passenger_traffic |
commuter service
growing demand tourist service high patronage |
gptkbp:safety_features |
surveillance systems
emergency services access train control systems fire safety measures level crossings |
gptkbp:services |
passenger services
|
gptkbp:stations |
gptkb:Ballarat_Station
gptkb:Southern_Cross gptkb:Deer_Park Melton Sunshine Footscray Maddingley Rockbank Bacchus_Marsh Carlsruhe |
gptkbp:terminus |
gptkb:Southern_Cross_Station
gptkb:Ballarat |
gptkbp:track |
1,600 mm (5 ft 3 in)
|
gptkbp:trainTypes |
heavy rail
|