Statements (19)
Predicate | Object |
---|---|
gptkbp:instanceOf |
gptkb:railway_line
|
gptkbp:electrification |
15 kV AC overhead
|
gptkbp:endPoint |
gptkb:Sainte-Croix
|
gptkbp:gauge |
metre gauge
|
https://www.w3.org/2000/01/rdf-schema#label |
Yverdon–Ste-Croix line
|
gptkbp:length |
24.3 km
|
gptkbp:locatedIn |
gptkb:Switzerland
|
gptkbp:numberOfTracks |
single track
|
gptkbp:opened |
1893
|
gptkbp:operator |
Travys
|
gptkbp:owner |
Travys
|
gptkbp:region |
gptkb:Canton_of_Vaud
|
gptkbp:serves |
gptkb:Baulmes
gptkb:Yverdon-les-Bains gptkb:Sainte-Croix gptkb:Vuiteboeuf |
gptkbp:startPoint |
gptkb:Yverdon-les-Bains
|
gptkbp:bfsParent |
gptkb:Yverdon-les-Bains_railway_station
|
gptkbp:bfsLayer |
6
|