Statements (29)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:dam
|
| gptkbp:annualGeneration |
1,888 GWh
|
| gptkbp:capacity |
558 MW
|
| gptkbp:constructionStartYear |
2013
|
| gptkbp:country |
gptkb:Turkey
|
| gptkbp:crosses |
gptkb:Çoruh_River
|
| gptkbp:damVolume |
2,900,000 m³
|
| gptkbp:displacedPeople |
gptkb:Yusufeli
several other villages |
| gptkbp:engineer |
gptkb:State_Hydraulic_Works_(DSI)
|
| gptkbp:hasTower |
3 x 186 MW Francis-type
|
| gptkbp:height |
275 meters
5th tallest arch dam in the world (as of 2023) tallest dam in Turkey |
| gptkbp:impounds |
gptkb:Çoruh_River
|
| gptkbp:length |
490 meters
|
| gptkbp:locatedIn |
gptkb:Turkey
gptkb:Artvin_Province |
| gptkbp:mainContractor |
gptkb:Limak_Construction
|
| gptkbp:opened |
2022
|
| gptkbp:owner |
gptkb:State_Hydraulic_Works_(DSI)
|
| gptkbp:purpose |
hydroelectric power generation
|
| gptkbp:reservoirCapacity |
2,130,000,000 m³
|
| gptkbp:spillwayCapacity |
7,125 m³/s
|
| gptkbp:status |
operational
|
| gptkbp:type |
gptkb:dam
|
| gptkbp:bfsParent |
gptkb:Çoruh_River
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Yusufeli Dam
|