gptkbp:instanceOf
|
gptkb:dam
|
gptkbp:annualGeneration
|
1,888 GWh
|
gptkbp:capacity
|
558 MW
|
gptkbp:constructionStartYear
|
2013
|
gptkbp:country
|
gptkb:Turkey
|
gptkbp:crosses
|
gptkb:Çoruh_River
|
gptkbp:damVolume
|
2,900,000 m³
|
gptkbp:displacedPeople
|
gptkb:Yusufeli
several other villages
|
gptkbp:engineer
|
gptkb:State_Hydraulic_Works_(DSI)
|
gptkbp:hasTower
|
3 x 186 MW Francis-type
|
gptkbp:height
|
275 meters
5th tallest arch dam in the world (as of 2023)
tallest dam in Turkey
|
https://www.w3.org/2000/01/rdf-schema#label
|
Yusufeli Dam
|
gptkbp:impounds
|
gptkb:Çoruh_River
|
gptkbp:length
|
490 meters
|
gptkbp:locatedIn
|
gptkb:Turkey
gptkb:Artvin_Province
|
gptkbp:mainContractor
|
gptkb:Limak_Construction
|
gptkbp:opened
|
2022
|
gptkbp:owner
|
gptkb:State_Hydraulic_Works_(DSI)
|
gptkbp:purpose
|
hydroelectric power generation
|
gptkbp:reservoirCapacity
|
2,130,000,000 m³
|
gptkbp:spillwayCapacity
|
7,125 m³/s
|
gptkbp:status
|
operational
|