Wudongde Dam

GPTKB entity

Statements (62)
Predicate Object
gptkbp:instance_of gptkb:dam
gptkbp:benefits job creation
electricity supply, flood control, irrigation
gptkbp:capacity 10,200 MW
gptkbp:challenges geological issues
gptkbp:climate_impact reduced carbon emissions
gptkbp:collaboration limited
gptkbp:community_relocation yes
gptkbp:constructed_in gptkb:China_Gezhouba_Group_Company
gptkbp:construction_cost $3.5 billion
gptkbp:construction_innovation new techniques used
gptkbp:construction_material concrete and steel
gptkbp:construction_method roller-compacted concrete
gptkbp:construction_started gptkb:2015
gptkb:2020
5 years
gptkbp:coordinates 27° 25′ 0″ N, 102° 36′ 0″ E
gptkbp:country gptkb:China
gptkbp:dam_type gravity dam
gptkbp:emergency_services established plans
gptkbp:environmental_impact gptkb:significant
gptkbp:flood_control gptkb:significant
yes
altered river flow
gptkbp:fuel_economy high
gptkbp:funding government and private investment
gptkbp:height 240 meters
gptkbp:historical_significance stimulated
https://www.w3.org/2000/01/rdf-schema#label Wudongde Dam
gptkbp:last_eruption earthquake-resistant
gptkbp:length 1,200 meters
gptkbp:local_economy positive
gptkbp:location gptkb:Yunnan,_China
gptkbp:occurs_annually about 38.4 TWh
gptkbp:operator gptkb:China_Three_Gorges_Corporation
gptkbp:power_source yes
conventional hydroelectric power station
38.4 TWh annually
gptkbp:project gptkb:2020
gptkb:China_Three_Gorges_Corporation
gptkb:Baihetan_Dam
2015-2020
gptkbp:public_perception generally positive
gptkbp:purpose gptkb:hydroelectric_power_generation
gptkbp:regulatory_compliance obtained
gptkbp:reservoir Wudongde Reservoir
gptkbp:river gptkb:Jinsha_River
gptkbp:safety_features advanced monitoring systems
gptkbp:significance one of the tallest dams in the world
gptkbp:spillway_type yes
gated spillway
gptkbp:status operational
gptkbp:sustainability_efforts considered high.
gptkbp:tourism high
gptkbp:turbine_type 6 Francis turbines
gptkbp:water_management maximum 1,200 meters above sea level
gptkbp:water_quality improved downstream water quality
gptkbp:water_requirement 1.3 billion cubic meters
gptkbp:water_source gptkb:Jinsha_River
gptkbp:wildlife habitat disruption
gptkbp:bfsParent gptkb:Lancang_River
gptkbp:bfsLayer 5