Statements (20)
Predicate | Object |
---|---|
gptkbp:instanceOf |
wind
|
gptkbp:annualGeneration |
approximately 295 GWh
|
gptkbp:capacity |
91.75 MW
|
gptkbp:commissioned |
April 2005
|
gptkbp:constructionCost |
A$180 million
|
gptkbp:country |
gptkb:Australia
|
gptkbp:gridConnection |
gptkb:ElectraNet
|
gptkbp:hasTower |
55
|
https://www.w3.org/2000/01/rdf-schema#label |
Wattle Point Wind Farm
|
gptkbp:latitude |
-34.995
|
gptkbp:location |
gptkb:Yorke_Peninsula
|
gptkbp:longitude |
137.613
|
gptkbp:operator |
gptkb:AGL_Energy
|
gptkbp:owner |
gptkb:Palisade_Investment_Partners
|
gptkbp:state |
gptkb:South_Australia
|
gptkbp:suppliesElectricityTo |
approximately 52,000 homes
|
gptkbp:turbine_capacity |
1.75 MW
|
gptkbp:turbineType |
gptkb:Vestas_V80
|
gptkbp:bfsParent |
gptkb:Edithburgh
|
gptkbp:bfsLayer |
7
|