Toyama Chihō Railway Main Line
GPTKB entity
Statements (16)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_line
|
| gptkbp:country |
gptkb:Japan
|
| gptkbp:electrification |
1,500 V DC overhead catenary
|
| gptkbp:endPoint |
gptkb:Unazuki_Onsen_Station
|
| gptkbp:gauge |
1,067 mm
|
| gptkbp:length |
53.3 km
|
| gptkbp:locatedIn |
gptkb:Toyama_Prefecture
|
| gptkbp:nativeName |
gptkb:富山地方鉄道本線
|
| gptkbp:numberOfStations |
36
|
| gptkbp:opened |
1913
|
| gptkbp:operatedBy |
gptkb:Toyama_Chihō_Railway
|
| gptkbp:startPoint |
Dentetsu-Toyama Station
|
| gptkbp:trackConfiguration |
single track
|
| gptkbp:bfsParent |
gptkb:Unazuki_Onsen_Station
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Toyama Chihō Railway Main Line
|