Statements (18)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:dam
|
| gptkbp:annualGeneration |
322 GWh
|
| gptkbp:capacity |
121 MW
|
| gptkbp:constructionStartYear |
1998
|
| gptkbp:country |
gptkb:Turkey
|
| gptkbp:crosses |
gptkb:Harşit_River
|
| gptkbp:height |
152 meters
|
| gptkbp:length |
320 meters
|
| gptkbp:locatedIn |
gptkb:Turkey
gptkb:Gümüşhane_Province |
| gptkbp:opened |
2007
|
| gptkbp:owner |
gptkb:State_Hydraulic_Works_(DSI)
|
| gptkbp:purpose |
hydroelectric power generation
|
| gptkbp:reservoirCapacity |
168,000,000 cubic meters
|
| gptkbp:type |
concrete-face rock-fill dam
|
| gptkbp:bfsParent |
gptkb:Harşit_River
|
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Torul Dam
|