Taiyuan-Jiaozuo High-Speed Railway
GPTKB entity
Properties (48)
Predicate | Object |
---|---|
gptkbp:instanceOf |
high-speed railway
|
gptkbp:benefits |
boosts local economy
reduces travel time enhances connectivity |
gptkbp:challenges |
environmental concerns
public opposition budget overruns construction delays land acquisition issues |
gptkbp:communicationEquipment |
CTCS-3
|
gptkbp:constructionMaterial |
approximately 50 billion yuan
|
gptkbp:constructionStarted |
2014
|
gptkbp:culturalImpact |
supports local businesses
promotes tourism facilitates cultural exchange |
gptkbp:electrification |
yes
|
gptkbp:environmentalImpact |
reduced carbon emissions
land use efficiency noise reduction measures |
gptkbp:futurePlans |
improve service quality
expansion to other cities increase train frequency |
https://www.w3.org/2000/01/rdf-schema#label |
Taiyuan-Jiaozuo High-Speed Railway
|
gptkbp:length |
approximately 400 kilometers
|
gptkbp:maxSpeed |
350 km/h
|
gptkbp:opened |
December 2019
|
gptkbp:operatesIn |
gptkb:Taiyuan
Jiaozuo |
gptkbp:operator |
gptkb:China_Railway_Corporation
|
gptkbp:partOf |
gptkb:China's_high-speed_rail_network
|
gptkbp:passengerCapacity |
up to 10 million annually
|
gptkbp:project |
gptkb:infrastructure_project
|
gptkbp:region |
gptkb:Henan_Province
gptkb:Shanxi_Province |
gptkbp:safetyFeatures |
advanced signaling technology
fire safety systems earthquake resistance |
gptkbp:stations |
gptkb:Taiyuan_South_Station
gptkb:Zhengzhou_East_Station gptkb:Anyang_East_Station gptkb:Jiaozuo_East_Station gptkb:Pingdingshan_East_Station Xinxiang East Station |
gptkbp:ticketingSystem |
mobile ticketing options
online booking available various fare classes |
gptkbp:track |
1435 mm (standard gauge)
|
gptkbp:travelTime |
approximately 2 hours
|