Statements (28)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_line
|
| gptkbp:connectsTo |
gptkb:Donghae_Line
gptkb:Yeongdong_Line gptkb:Jungang_Line |
| gptkbp:electrification |
25 kV/60 Hz AC overhead line
|
| gptkbp:endPoint |
gptkb:Baeksan_Station
|
| gptkbp:gauge |
standard gauge
|
| gptkbp:length |
93.1 km
|
| gptkbp:locatedIn |
gptkb:South_Korea
|
| gptkbp:notableFeature |
includes Korea's highest railway station (Chujeon Station)
includes Korea's longest railway tunnel (Jeongam Tunnel) |
| gptkbp:opened |
1955
|
| gptkbp:operatedBy |
gptkb:Korea_Railroad_Corporation
|
| gptkbp:ownedBy |
gptkb:Korea_Railroad_Corporation
|
| gptkbp:passesThrough |
gptkb:Gangwon-do
gptkb:Chungcheongbuk-do |
| gptkbp:primaryUse |
passenger transport
freight transport |
| gptkbp:servesCity |
gptkb:Samcheok
gptkb:Taebaek gptkb:Yeongwol Jecheon |
| gptkbp:startPoint |
gptkb:Jecheon_Station
|
| gptkbp:bfsParent |
gptkb:Jecheon_Station
gptkb:Korea_Railroad_Corporation gptkb:Jungang_Line |
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
Taebaek Line
|