gptkbp:instance_of
|
gptkb:dam
|
gptkbp:benefits
|
provided
|
gptkbp:building_type
|
earth-fill dam
|
gptkbp:capacity
|
1,500 MW
|
gptkbp:climate_adaptation
|
considered
|
gptkbp:climate_impact
|
mitigated
|
gptkbp:community_engagement
|
involved
|
gptkbp:constructed_in
|
gptkb:Turkish_State_Hydraulic_Works
|
gptkbp:construction_cost
|
approximately $30 million
|
gptkbp:construction_method
|
earth and rock fill
|
gptkbp:construction_started
|
gptkb:1956
1953
|
gptkbp:dam_type
|
embankment dam
|
gptkbp:electrification
|
renewable energy
1,500 MW
|
gptkbp:emergency_services
|
established
|
gptkbp:environmental_impact
|
habitat alteration
|
gptkbp:fish_species
|
gptkb:trout
|
gptkbp:flood_control
|
gptkb:true
1,000,000,000 cubic meters
|
gptkbp:height
|
64 meters
1,650 meters
|
gptkbp:historical_significance
|
high
|
https://www.w3.org/2000/01/rdf-schema#label
|
Seyhan Dam
|
gptkbp:hydrological_region
|
Mediterranean region
|
gptkbp:length
|
1,650 meters
|
gptkbp:local_economy
|
positive
|
gptkbp:location
|
gptkb:Turkey
|
gptkbp:maintenance
|
regular
|
gptkbp:occurs_annually
|
4,000 GWh
|
gptkbp:operator
|
gptkb:State_Hydraulic_Works_of_Turkey
|
gptkbp:primary_use
|
gptkb:hydroelectric_power_generation
water supply
irrigation
|
gptkbp:region
|
gptkb:Adana_Province
|
gptkbp:research
|
conducted
|
gptkbp:reservoir
|
gptkb:Seyhan_Reservoir
approximately 30 km²
1,200,000,000 cubic meters
|
gptkbp:river
|
gptkb:Seyhan_River
|
gptkbp:safety_measures
|
implemented
|
gptkbp:security
|
enhanced
|
gptkbp:spillway_type
|
gated spillway
|
gptkbp:status
|
operational
|
gptkbp:tourist_attraction
|
gptkb:true
|
gptkbp:turbine_type
|
gptkb:6
Francis turbine
|
gptkbp:water_management
|
controlled
integrated
|
gptkbp:water_quality
|
monitored
|
gptkbp:year
|
gptkb:1956
|
gptkbp:bfsParent
|
gptkb:Seyhan_River
|
gptkbp:bfsLayer
|
6
|