Severn Tunnel

GPTKB entity

Statements (58)
Predicate Object
gptkbp:instance_of gptkb:cave
gptkbp:academic_programs Innovative for its time
gptkbp:accessibility Limited for the public
gptkbp:associated_with Brunel's engineering projects
gptkbp:breathability Natural ventilation system
gptkbp:challenges Water ingress
gptkbp:communication_system Modern signaling technology
gptkbp:construction_material gptkb:Brick
gptkbp:construction_started 1873
1886
gptkbp:crosses gptkb:River_Severn
gptkbp:design Brick arch
gptkbp:emergency_exits gptkb:Yes
gptkbp:emergency_services gptkb:Limited
gptkb:Yes
Conducted regularly
Trained personnel available
gptkbp:environmental_impact Mitigated during construction
gptkbp:famous_for Being the longest rail tunnel in the UK at the time of opening
gptkbp:famous_landmark gptkb:Yes
gptkbp:flooding_incidents Occasional
gptkbp:geological_formation Triassic sandstone
gptkbp:has_toll No
gptkbp:historical_event Opened by the Prince of Wales
gptkbp:historical_significance First rail tunnel under a major river in the UK
https://www.w3.org/2000/01/rdf-schema#label Severn Tunnel
gptkbp:length 7.0 miles
gptkbp:lighting Electric lighting
gptkbp:location gptkb:England
gptkb:Wales
gptkbp:maintenance Regular inspections
gptkbp:max_speed 75 mph
gptkbp:number_of_tracks 2
gptkbp:opened 1886
gptkbp:owner gptkb:Network_Rail
gptkbp:railway_line gptkb:South_Wales_Main_Line
None within the tunnel
Significant in UK railway history
gptkbp:renovation 2000s
gptkbp:safety_features Fire alarms
gptkbp:serves gptkb:Great_Western_Railway
gptkbp:tourist_attraction No
gptkbp:tunnel_construction Involved thousands of workers
gptkbp:tunnel_history Rich history since 19th century
gptkbp:tunnel_inspection Regular inspections required
gptkbp:tunnel_maintenance Ongoing maintenance required
gptkbp:tunnel_safety High safety standards maintained
gptkbp:tunnel_status Operational
gptkbp:tunnel_survey Conducted before construction
gptkbp:tunnel_usage Heavily used by trains daily
gptkbp:used_by Freight trains
Passenger trains
gptkbp:ventilation_shafts gptkb:Yes
gptkbp:wing_configuration Railway tunnel
5.5 meters
Designed for heavy freight traffic
gptkbp:bfsParent gptkb:South_Wales_Main_Line
gptkbp:bfsLayer 6