Serra da Mesa Dam

GPTKB entity

Statements (55)
Predicate Object
gptkbp:instance_of gptkb:dam
gptkbp:bfsLayer 6
gptkbp:bfsParent gptkb:State_of_Goiás
gptkb:Serra_da_Mesa_Lake
gptkbp:annual_event 5,000 G Wh
gptkbp:base 500 m
gptkbp:can_be gptkb:1998
gptkbp:capacity 1,275 MW
39,000,000,000 m³
gptkbp:constructed_in gptkb:1980
gptkb:1998
gptkb:Camargo_Corrêa
embankment dam
earth and rock fill
gptkbp:construction_cost $1.5 billion
gptkbp:country gptkb:Brazil
gptkbp:crosses gptkb:Araguaia_River
gptkbp:dam rock-fill dam
gptkbp:drainage_basin 70 m
gptkbp:emergency_services in place
gptkbp:engine_type gptkb:6
Francis turbine
gptkbp:environmental_impact gptkb:significant
displacement of communities
gptkbp:fishing_regulations reduced fish populations
gptkbp:has_public_transport gptkb:battle
gptkbp:height 130 m
130 meters
https://www.w3.org/2000/01/rdf-schema#label Serra da Mesa Dam
gptkbp:infrastructure transmission lines
gptkbp:length 1,800 meters
gptkbp:location gptkb:Brazil
gptkbp:maintenance annual
gptkbp:migration gptkb:battle
gptkbp:operator gptkb:Electrobras
gptkbp:owner gptkb:Government_of_Brazil
gptkbp:power_output conventional power station
gptkbp:primary_function electricity generation
gptkbp:primary_source irrigation
flood control
gptkbp:production_years gptkb:1998
gptkbp:purpose gptkb:railway_station
gptkbp:region Central-West Region
gptkbp:regulatory_compliance gptkb:National_Electric_Energy_Agency_(ANEEL)
gptkbp:reservoir gptkb:Serra_da_Mesa_Reservoir
1,200 km²
gptkbp:safety_features regular inspections
gptkbp:spillway_type gptkb:battle
gated spillway
gptkbp:tourist_attraction high
gptkbp:water_management gptkb:battle
1,200 km²
39,000,000,000 m³
gptkbp:water_source gptkb:Araguaia_River
gptkbp:wildlife habitat loss