Scarborough Rapid Transit

GPTKB entity

Properties (56)
Predicate Object
gptkbp:instanceOf transportation system
gptkbp:accessibility ADA_compliant
gptkbp:annualRidership approximately 10,000 daily riders
gptkbp:challenges service delays
funding for expansion projects
gptkbp:community_engagement public consultations held
gptkbp:community_impact improved local economy
gptkbp:community_outreach active community outreach programs
gptkbp:community_service provides access to community services
gptkbp:construction_cost $200 million
gptkbp:cultural_impact enhanced cultural exchange
gptkbp:design elevated and at-grade sections
gptkbp:electrification overhead catenary
gptkbp:emergencyServices cooperation with local emergency services
gptkbp:environmental_impact reduced traffic congestion
gptkbp:feedback regular surveys conducted
gptkbp:frequency every 6-10 minutes
gptkbp:funding funded by provincial and federal governments
gptkbp:future_plans extension_to_Sheppard_Avenue
gptkbp:futurePlans gptkb:Scarborough_Subway_Extension
signal system upgrades
sustainable urban transit solutions
gptkbp:historical_significance first rapid transit line in Scarborough
https://www.w3.org/2000/01/rdf-schema#label Scarborough Rapid Transit
gptkbp:impact reduced commuting times
gptkbp:integration integrated with bus services
gptkbp:isConnectedTo gptkb:Toronto_subway
gptkbp:length 7.5 km
gptkbp:localGovernment supported by local government initiatives
gptkbp:location gptkb:Scarborough,_Toronto
gptkbp:maintenance gptkb:Scarborough_RT_Yard
gptkbp:nextStation gptkb:Kennedy_Station
gptkb:McCowan_Station
gptkbp:opened 1985
gptkbp:operator gptkb:Toronto_Transit_Commission
gptkbp:partnerships collaborations with local businesses
gptkbp:previousName gptkb:Scarborough_RT
gptkbp:productLine 1
gptkbp:public_perception generally positive feedback
gptkbp:public_transport_access aims for equitable access to transit
part_of_Toronto's_public_transport_system
gptkbp:region important for regional connectivity
gptkbp:safety_features CCTV surveillance
gptkbp:safetyFeatures enhanced public safety measures
gptkbp:service_area gptkb:Scarborough_district
gptkbp:serviceType light rail
gptkbp:significantEvent opened in 1985
gptkbp:speed 30 km/h
gptkbp:stations 6
modern design
gptkbp:sustainability_initiatives focus on eco-friendly practices
gptkbp:technology light rail technology
gptkbp:ticketingSystem TTC fare system
gptkbp:track 1435 mm (standard gauge)
gptkbp:transmission urban transit
gptkbp:transportation integrated_into_Toronto's_transportation_network