gptkbp:instance_of
|
gptkb:commuter_rail
|
gptkbp:accessibility
|
partially accessible
|
gptkbp:annual_ridership
|
approximately 20,000
increasing over the years
|
gptkbp:average_speed
|
30 km/h
|
gptkbp:community_events
|
TTC community outreach programs
|
gptkbp:community_feedback
|
mixed responses on service quality
|
gptkbp:community_impact
|
improved local transit access
|
gptkbp:connects
|
gptkb:Bloor-Danforth_line
|
gptkbp:construction_method
|
cut-and-cover and elevated construction
|
gptkbp:construction_started
|
gptkb:1981
|
gptkbp:design
|
elevated and at-grade sections
|
gptkbp:electrification
|
overhead wire
|
gptkbp:emergency_services
|
TTC emergency response team
|
gptkbp:environmental_impact
|
reduced traffic congestion
|
gptkbp:fare_system
|
TTC fare system
|
gptkbp:future_goals
|
part of Smart Track plan.
|
gptkbp:future_plans
|
extension proposals
|
gptkbp:historical_significance
|
first rapid transit line in Scarborough
|
https://www.w3.org/2000/01/rdf-schema#label
|
Scarborough RT
|
gptkbp:integration
|
integrated with GO Transit
|
gptkbp:length
|
7.5 km
|
gptkbp:local_government
|
gptkb:City_of_Toronto
|
gptkbp:location
|
gptkb:Scarborough,_Toronto
|
gptkbp:maintenance
|
gptkb:Scarborough_RT_Yard
|
gptkbp:next_station
|
gptkb:Kennedy_Station
|
gptkbp:number_of_lines
|
gptkb:1
|
gptkbp:opened
|
gptkb:1985
|
gptkbp:operated_by
|
gptkb:Toronto_Transit_Commission
|
gptkbp:operating_hours
|
24 hours on weekends
|
gptkbp:part_of
|
gptkb:Toronto_Transit_System
|
gptkbp:previous_name
|
gptkb:Scarborough_Rapid_Transit
|
gptkbp:public_art
|
art installations at stations
|
gptkbp:rolling_stock
|
gptkb:Bombardier_Flexity_Outlook
|
gptkbp:safety_features
|
CCTV surveillance
|
gptkbp:service_area
|
gptkb:Scarborough_district
|
gptkbp:service_type
|
rapid transit
|
gptkbp:stations
|
gptkb:6
gptkb:Mc_Cowan_Station
Kennedy, Scarborough Centre, Mc Cowan, and others.
|
gptkbp:status
|
in operation
|
gptkbp:ticketing_system
|
token and Presto card
|
gptkbp:track_gauge
|
1435 mm
|
gptkbp:train_types
|
6-8 minutes
|
gptkbp:trains
|
5:00 AM
1:00 AM
|
gptkbp:transportation
|
gptkb:Kennedy_Station
|
gptkbp:upgrades
|
signal system upgrades
|
gptkbp:bfsParent
|
gptkb:Line_7_Scarborough
gptkb:Scarborough
gptkb:TTC_subway
|
gptkbp:bfsLayer
|
5
|