Properties (57)
Predicate | Object |
---|---|
gptkbp:instanceOf |
bridge
|
gptkbp:built |
4 years
navigating environmental regulations |
gptkbp:communityEvents |
hosted on the bridge
|
gptkbp:communityFeedback |
considered during planning
|
gptkbp:communityImpact |
improved regional connectivity
|
gptkbp:connects |
Seattle_and_Medina
|
gptkbp:constructionMaterial |
2010
$4.65 billion floating bridge technology |
gptkbp:constructionStarted |
2006
|
gptkbp:crosses |
gptkb:Lake_Washington
|
gptkbp:design |
gptkb:HNTB_Corporation
cable-stayed received multiple accolades |
gptkbp:designedBy |
HNTB_Corporation_and_Kiewit_Corporation
|
gptkbp:educationalPrograms |
developed for local schools
|
gptkbp:electronicSystems |
utilized advanced materials
|
gptkbp:emergencyServices |
designed for quick response
part of regional emergency plan |
gptkbp:environmentalImpact |
conducted prior to construction
installed for safety mitigated through various measures |
gptkbp:features |
tolling system
dedicated bicycle and pedestrian path |
gptkbp:funding |
state and federal funds
|
gptkbp:futurePlans |
potential expansion projects
planned for technology improvements |
gptkbp:height |
approximately 40 feet above the water
|
gptkbp:historicalSignificance |
part_of_Washington's_transportation_history
|
https://www.w3.org/2000/01/rdf-schema#label |
SR 520 Bridge
|
gptkbp:impact |
studied during planning phase
|
gptkbp:landmark |
notable infrastructure project
|
gptkbp:length |
580 feet
1.4 miles |
gptkbp:location |
gptkb:Washington,_USA
|
gptkbp:maintenance |
gptkb:Washington_State_Department_of_Transportation
|
gptkbp:opened |
2010
|
gptkbp:openingHours |
2011
|
gptkbp:openToPublic |
2014
July 2010 |
gptkbp:partOf |
gptkb:State_Route_520
|
gptkbp:passenger_traffic |
monitored regularly
approximately 100,000 vehicles per day 6 lanes integrated with regional systems |
gptkbp:products |
gptkb:SR_520_Bridge_Replacement_and_HOV_Project
|
gptkbp:project |
reduce congestion
|
gptkbp:publicAccess |
incorporated into design
available for all vehicles prioritized in design. |
gptkbp:replacedBy |
gptkb:old_SR_520_Bridge
|
gptkbp:safetyFeatures |
emergency lanes
|
gptkbp:toll |
varies by vehicle type
December 2011 |
gptkbp:type |
floating bridge
|
gptkbp:uses |
precast_concrete_pontoons
|