Properties (64)
Predicate | Object |
---|---|
gptkbp:instanceOf |
Dam
|
gptkbp:affiliatedWith |
Improved due to project
|
gptkbp:built |
1978
1984 6 years Earthfill |
gptkbp:climate |
Designed to withstand climate variations
|
gptkbp:community_engagement |
Involved local stakeholders
|
gptkbp:community_impact |
Local employment opportunities
|
gptkbp:community_involvement |
Local support for project
|
gptkbp:construction_cost |
Estimated $10 million
|
gptkbp:country |
gptkb:Nepal
|
gptkbp:culturalHeritage |
Influenced by dam construction
|
gptkbp:debutYear |
1975
|
gptkbp:electrification |
Located at the base
|
gptkbp:emergencyServices |
Flood management plan
Preparedness drills conducted |
gptkbp:energyEfficiency |
Contributes to national energy security
|
gptkbp:engineType |
gptkb:Francis_turbine
|
gptkbp:environmental_impact |
Altered river ecosystem
Improved local economy Affected local climate |
gptkbp:environmentalProtection |
Implemented for environmental protection
Completed_before_construction |
gptkbp:feedback |
Regularly collected from locals
|
gptkbp:fishSpecies |
Not implemented
|
gptkbp:funding |
Government and international loans
|
gptkbp:future_plans |
Conducted post-construction
Long-term benefits for community |
gptkbp:geographicalFeature |
Connected to national grid
|
gptkbp:geologicalFeatures |
Conducted before construction
Designed for earthquakes |
gptkbp:height |
70 meters
|
https://www.w3.org/2000/01/rdf-schema#label |
Rangit Dam
|
gptkbp:is_a_source_of |
Irrigation
|
gptkbp:length |
300 meters
|
gptkbp:lighting |
Yes
|
gptkbp:location |
gptkb:Nepal
|
gptkbp:maintenance |
Regular inspections
|
gptkbp:operational_status |
20 MW
|
gptkbp:operator |
gptkb:Nepal_Electricity_Authority
|
gptkbp:owner |
Government of Nepal
Required for construction |
gptkbp:productionCompany |
Nepal_Construction_Company
|
gptkbp:productionYears |
100 GWh
|
gptkbp:project |
Managed_by_Nepal_Electricity_Authority
|
gptkbp:purpose |
Hydroelectric power generation
|
gptkbp:region |
Key energy source for region
|
gptkbp:regulatoryBody |
gptkb:Department_of_Electricity_Development
|
gptkbp:reservoir |
gptkb:Rangit_Reservoir
|
gptkbp:river |
gptkb:Rangit_River
|
gptkbp:safety_features |
Seepage monitoring
|
gptkbp:spillwayType |
Gated spillway
|
gptkbp:tourism |
Attracts visitors
|
gptkbp:type |
Embankment dam
|
gptkbp:waterManagement |
Conducted prior to construction
Continuous monitoring system Managed for irrigation needs |
gptkbp:waterQuality |
gptkb:Rangit_River
1.5 million cubic meters Regular testing For agriculture and domestic use |
gptkbp:wildlife |
Habitat affected by dam
|
gptkbp:year |
1985
|