Statements (23)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_station
|
| gptkbp:country |
gptkb:China
|
| gptkbp:electrification |
overhead line
|
| gptkbp:future_lines_under_construction |
Line 2
|
| gptkbp:Line_1_length |
39.182 km
|
| gptkbp:Line_1_number_of_stations |
28
|
| gptkbp:Line_1_opening_date |
10 November 2022
|
| gptkbp:Line_2_planned_opening |
2025
|
| gptkbp:Line_2_status |
under construction
|
| gptkbp:location |
gptkb:Nantong
|
| gptkbp:logo |
Nantong Rail Transit logo.svg
|
| gptkbp:nativeName |
gptkb:南通轨道交通
|
| gptkbp:number_of_lines_(operational) |
1
|
| gptkbp:numberPlanned |
4
|
| gptkbp:opened |
Line 1
|
| gptkbp:operator |
gptkb:Nantong_Rail_Transit_Co.,_Ltd.
|
| gptkbp:system_length_(operational) |
39.2 km
|
| gptkbp:system_length_(planned) |
170 km
|
| gptkbp:trackGauge |
1435 mm
|
| gptkbp:website |
http://www.ntmetro.com.cn/
|
| gptkbp:bfsParent |
gptkb:Metro
|
| gptkbp:bfsLayer |
5
|
| https://www.w3.org/2000/01/rdf-schema#label |
Nantong Rail Transit
|