gptkbp:instance_of
|
gptkb:hydroelectric_power_generation
|
gptkbp:benefits
|
job creation
|
gptkbp:capacity
|
824 megawatts
|
gptkbp:challenges
|
cost overruns
|
gptkbp:climate_impact
|
considered
|
gptkbp:community_consultations
|
conducted
|
gptkbp:community_impact
|
controversial
assessed
|
gptkbp:construction_cost
|
$12.7 billion
|
gptkbp:construction_started
|
gptkb:2013
|
gptkbp:dam_type
|
rock-fill dam
|
gptkbp:design
|
gptkb:Astaldi
|
gptkbp:emissions_standard
|
gptkb:significant
|
gptkbp:employs
|
utilized
|
gptkbp:energy_transition
|
supports
|
gptkbp:environmental_concerns
|
aligned with provincial
|
gptkbp:environmental_impact
|
gptkb:significant
completed
|
gptkbp:expansion_plans
|
considered
|
gptkbp:first_power_generation_date
|
gptkb:2019
|
gptkbp:flood_control
|
approximately 39 square kilometers
|
gptkbp:funding
|
secured
|
gptkbp:geological_formation
|
conducted
|
gptkbp:has_meetings
|
held
|
gptkbp:historical_achievement
|
tracked
|
gptkbp:historical_significance
|
high
|
https://www.w3.org/2000/01/rdf-schema#label
|
Muskrat Falls Hydroelectric Project
|
gptkbp:hydrology
|
conducted
|
gptkbp:impact_on_fish_habitat
|
negative
|
gptkbp:indigenous_consultation
|
required
|
gptkbp:is_opposed_by
|
notable
|
gptkbp:is_visible_from
|
promoted
|
gptkbp:lifespan
|
gptkb:50_years
|
gptkbp:local_government
|
strong
|
gptkbp:location
|
gptkb:Labrador,_Canada
|
gptkbp:occurs_annually
|
4.9 terawatt-hours
|
gptkbp:owner
|
gptkb:Nalcor_Energy
|
gptkbp:payment_methods
|
gptkb:Partnerships
|
gptkbp:power_source
|
high
aimed for
|
gptkbp:powerhouse_type
|
underground powerhouse
|
gptkbp:primary_use
|
electricity generation
|
gptkbp:project
|
ongoing
delayed
hydroelectric development
Lower Churchill Project
|
gptkbp:project_reviews
|
conducted
|
gptkbp:provides_oversight_for
|
governmental
|
gptkbp:regulatory_body
|
gptkb:Government_of_Newfoundland_and_Labrador
|
gptkbp:reservoir
|
gptkb:Muskrat_Falls_Reservoir
|
gptkbp:river
|
Churchill River
|
gptkbp:safety_measures
|
implemented
|
gptkbp:spillway_type
|
gated spillway
|
gptkbp:stakeholders
|
ongoing
|
gptkbp:status
|
under construction
|
gptkbp:sustainability
|
gptkb:significant
|
gptkbp:transmission_line
|
gptkb:Labrador-Island_Link
|
gptkbp:turbine_type
|
gptkb:5
|
gptkbp:water_source
|
Churchill River watershed
|
gptkbp:year
|
gptkb:2020
|
gptkbp:bfsParent
|
gptkb:Lavalin_Group
|
gptkbp:bfsLayer
|
6
|