Mohmand Dam

GPTKB entity

Statements (74)
Predicate Object
gptkbp:instance_of gptkb:dam
gptkbp:agricultural_productivity boosts agricultural productivity
gptkbp:annual_energy_output 3.5 billion k Wh
gptkbp:benefits water supply
irrigation
flood control
gptkbp:capacity 800 MW
gptkbp:climate_adaptation aids in climate change adaptation
gptkbp:climate_impact requires climate impact assessment
gptkbp:community_engagement local consultations
gptkbp:community_health improves community health
gptkbp:community_impact displacement of local population
gptkbp:community_involvement enhances community resilience
supports community development projects
supports climate adaptation
gptkbp:construction_material local materials
roller-compacted concrete
gptkbp:construction_started gptkb:2018
gptkbp:construction_status ongoing
gptkbp:coordinates 34.0000° N, 71.5000° E
gptkbp:country gptkb:Pakistan
gptkbp:dam_type embankment dam
gptkbp:design gptkb:China_Gezhouba_Group_Company
gptkbp:economic_impact positive socioeconomic impact
gptkbp:energy_diversification diversifies energy sources
gptkbp:energy_exports potential for energy exports
gptkbp:energy_independence contributes to energy independence
gptkbp:energy_infrastructure strengthens energy infrastructure
gptkbp:environmental_impact ecosystem alteration
gptkbp:expected_completion_year 2025
gptkbp:flood_control reduces flood risk
gptkbp:height 213 meters
gptkbp:historical_significance gptkb:economic_development
first major dam in Mohmand District
https://www.w3.org/2000/01/rdf-schema#label Mohmand Dam
gptkbp:impact boosts local economy
gptkbp:international_response backed by international agencies
gptkbp:is_monitored_by requires environmental monitoring
gptkbp:local_government supported by local government
gptkbp:location Mohmand District
gptkbp:operator gptkb:Water_and_Power_Development_Authority_(WAPDA)
gptkbp:participated_in encourages local participation
gptkbp:payment_methods China-Pakistan Economic Corridor (CPEC)
gptkbp:power_generation_capacity 800 MW
gptkbp:projected_cost 2.5 billion USD
gptkbp:projected_economic_growth stimulates economic growth
gptkbp:projected_electricity_cost lower electricity costs
gptkbp:projected_investment_return high investment return
gptkbp:projected_jobs_created thousands
gptkbp:projected_population_growth addresses projected population growth
gptkbp:purpose hydropower generation
gptkbp:regional_collaboration promotes regional collaboration
gptkbp:regional_investment attracts regional investment
gptkbp:regional_partnerships fosters regional partnerships
gptkbp:regional_stability promotes regional stability
gptkbp:research_opportunities provides research opportunities
gptkbp:reservoir 1.6 million acre-feet
gptkbp:river gptkb:Swat_River
gptkbp:safety_features earthquake resistance
gptkbp:safety_measures meets safety standards
gptkbp:security enhances energy security
gptkbp:spillway_capacity 10,000 cubic meters per second
gptkbp:sustainability_initiatives focus on sustainability
gptkbp:tourism potential for tourism development
gptkbp:turbine_type Francis turbine
gptkbp:water_distribution improves water distribution
gptkbp:water_management improves water management
supports water conservation efforts
improves water quality management
enhances water resource management
gptkbp:water_quality_improvement reduces sedimentation
gptkbp:water_storage increases water storage capacity
gptkbp:bfsParent gptkb:Mohmand_Agency
gptkbp:bfsLayer 6