Missouri River Lock and Dam No. 12
GPTKB entity
Statements (53)
Predicate | Object |
---|---|
gptkbp:instanceOf |
Lock and Dam
|
gptkbp:annualVisitors |
100,000 MWh
|
gptkbp:associatedWith |
gptkb:Missouri_River_Basin_Project
|
gptkbp:built |
1960
|
gptkbp:caps |
1,000,000 acre-feet
|
gptkbp:communityImpact |
Local economy support
|
gptkbp:constructedIn |
1960
|
gptkbp:constructionMaterial |
Concrete
|
gptkbp:constructionStarted |
1956
|
gptkbp:crosses |
gptkb:Missouri_River
|
gptkbp:emergencyServices |
Flood response plans
|
gptkbp:enginePower |
30 MW
|
gptkbp:environmentalImpact |
Habitat alteration
|
gptkbp:fishSpecies |
Changes in fish populations
|
gptkbp:flag |
110 feet by 600 feet
|
gptkbp:height |
50 feet
|
gptkbp:historicalSignificance |
Part_of_the_Missouri_River_navigation_system
|
https://www.w3.org/2000/01/rdf-schema#label |
Missouri River Lock and Dam No. 12
|
gptkbp:impact |
Increased recreational opportunities
Ecosystem changes Irrigation support Reduced flood risk Regulated river flow Altered habitats Economic development opportunities Altered hydrological patterns Altered water temperatures Enhanced flood management capabilities Increased tourism potential Sediment retention |
gptkbp:keyIssues |
1
|
gptkbp:length |
1,200 feet
|
gptkbp:lighting |
500,000 acre-feet
|
gptkbp:locatedIn |
gptkb:Missouri
|
gptkbp:maintenance |
Regular inspections
|
gptkbp:managedBy |
gptkb:U.S._Army_Corps_of_Engineers
|
gptkbp:operatedBy |
gptkb:U.S._Army_Corps_of_Engineers
|
gptkbp:operationalStatus |
1960
|
gptkbp:primaryMission |
Hydroelectric power generation
Navigation |
gptkbp:provides |
navigation
hydroelectric power flood control |
gptkbp:recreation |
Boating
Camping Fishing Hiking |
gptkbp:reservoir |
gptkb:Lake_Francis_Case
|
gptkbp:spillwayType |
Gated spillway
|
gptkbp:type |
Concrete gravity dam
|
gptkbp:waterQuality |
Altered sediment transport
Improved water quality management |
gptkbp:wildlife |
Fish migration barriers
|