Statements (26)
| Predicate | Object |
|---|---|
| gptkbp:instanceOf |
gptkb:railway_line
|
| gptkbp:connects |
gptkb:LRT-1
gptkb:MRT-3 |
| gptkbp:constructionStartYear |
2016
|
| gptkbp:country |
gptkb:Philippines
|
| gptkbp:electrification |
overhead catenary
|
| gptkbp:endPoint |
gptkb:San_Jose_del_Monte
|
| gptkbp:gauge |
standard gauge (1,435 mm)
|
| gptkbp:length |
22.8 kilometers
|
| gptkbp:locatedIn |
gptkb:Metro_Manila
|
| gptkbp:mainDepotLocation |
gptkb:San_Jose_del_Monte,_Bulacan
|
| gptkbp:numberOfStations |
14
|
| gptkbp:operator |
gptkb:San_Miguel_Corporation
|
| gptkbp:owner |
gptkb:Universal_LRT_Corporation
|
| gptkbp:plannedOpening |
2025
|
| gptkbp:rollingStock |
gptkb:Hyundai_Rotem
|
| gptkbp:servesArea |
gptkb:Bulacan
gptkb:Caloocan Quezon City |
| gptkbp:startPoint |
gptkb:North_Avenue
|
| gptkbp:status |
under construction
|
| gptkbp:type |
elevated and at-grade railway
|
| gptkbp:bfsParent |
gptkb:Quezon_Memorial_Circle
gptkb:San_Jose_del_Monte |
| gptkbp:bfsLayer |
7
|
| https://www.w3.org/2000/01/rdf-schema#label |
MRT-7 (under construction)
|