Statements (24)
| Predicate | Object | 
|---|---|
| gptkbp:instanceOf | gptkb:railway_station | 
| gptkbp:color | brown | 
| gptkbp:connects | gptkb:M2_line_(Istanbul_Metro) | 
| gptkbp:electrification | 750 V DC third rail | 
| gptkbp:endPoint | Boğaziçi Üniversitesi/Hisarüstü | 
| gptkbp:location | gptkb:Istanbul,_Turkey | 
| gptkbp:numberOfStations | 4 | 
| gptkbp:opened | 19 April 2015 | 
| gptkbp:operator | gptkb:Metro_Istanbul | 
| gptkbp:partOf | gptkb:Istanbul_Metro | 
| gptkbp:serves | gptkb:Şişli_district gptkb:Beşiktaş_district gptkb:Sarıyer_district | 
| gptkbp:startPoint | gptkb:Levent | 
| gptkbp:station | gptkb:Etiler gptkb:Levent Boğaziçi Üniversitesi/Hisarüstü Nispetiye | 
| gptkbp:systemLength | 3.3 km | 
| gptkbp:trackGauge | 1435 mm | 
| gptkbp:type | rapid transit | 
| gptkbp:bfsParent | gptkb:M2_line_(Istanbul_Metro) | 
| gptkbp:bfsLayer | 8 | 
| https://www.w3.org/2000/01/rdf-schema#label | M6 line (Istanbul Metro) |